Anonymized visualization of the Meadowline community solar garden.Installed project

Regional U.S. utility service territory

Meadowline

Utility scaleCommunity solarGrid-interconnected

Completed project record. Approved technical facts and outcomes are preserved while property names and identifying details are withheld or generalized.

Project overview

Meadowline

"Meadowline" is a 2.18 MW DC community solar project interconnected with a regional investor-owned utility and serving residential subscribers across the surrounding service territory.

The work began with identifying and evaluating land suitable for a utility-scale ground-mount array. Site feasibility, array configuration, utility requirements, and interconnection constraints were considered together as the project moved from raw land through design and implementation.

JLJ’s principal engineer led site selection and design implementation through utility interconnection. The completed project entered operation in early 2022 and continues to serve subscribers through the community solar program.

System profile

System profile

Battery storage
Not applicable
Power capacity
2.18 MW DC
Solar
Utility-scale ground-mount PV
Generator
None
Controlled loads
Regional subscriber allocation
Electrical service
Regional utility interconnection
Backup scope
Grid-connected generation
Project stage
Installed project

System architecture

System architecture

  1. Site selection + feasibility
  2. Array layout development
  3. Ground-mount PV system
  4. Utility interconnection + subscriber allocation

Technologies and considerations

Technologies and considerations

  • Utility-scale ground-mount PV
  • Land and site feasibility
  • Array layout development
  • Utility interconnection requirements
  • Community solar implementation
  • Grid-connected generation

Technical details

Technical details

Ground-mounted solar array and closed electrical equipment on a mountain property.
01Utility-scale ground-mount array
Coordinated electrical plans, load schedules, and one-line diagrams on an engineering worktable.
02Array layout and implementation
Residential solar contribution study with plans, sun-path diagrams, and irradiance graphics.
03Site feasibility and interconnection

Outcome

A 2.18 MW DC community solar garden carried from site selection and feasibility through design implementation and utility interconnection, with the completed system operating since early 2022.